Here are some late pictures of the inside progress of the addition. The drywall was up, inspected, taped, and textured. I painted it last weekend. There was considerable floor demolition of old tile and building up the sub-floor to the level of the original hardwood. Cost me 2 days work but saved us $1200.
No comments:
Post a Comment